In 2004-05, Southern California Edison (SCE) contracted with CMTC to demonstrate that plant energy efficiency could be cost effectively realized as a result of factory productivity improvement projects partially funded by the utility. This approach emphasizes increasing the efficiency of the whole manufacturing process and not just individual pieces of equipment such as lighting, motors, fans, pumps, compressors, boilers, etc.
The energy savings estimation tool developed for this program evaluates the energy savings as being the result of one or a combination of the following energy saving impacts:
This paper will also discuss:
In 2004-05, Southern California Edison (SCE) contracted with CMTC to demonstrate that plant energy efficiency could be realized as a result of factory productivity improvement projects partially funded by the utility.
Please complete the form to the right to receive your PDF copy of the Energy Savings in Manufacturing White Paper now.
Phone: | (310) 263-3060 |
---|---|
Contact CMTC: | Contact CMTC Here |
Address: |
California Manufacturing Technology Consulting® (CMTC) |